Skip to main content
Keep Idaho Beautiful Informed Kootenai Join us on Facebook (opens in a new tab)

All updates

Every post from all three efforts, newest first.

  1. Communications ·

    Escalation of Level 2 Alternatives for the Rathdrum Prairie Planning and Environmental Linkages (PEL) Study and Concerns

    by

    An escalation letter to the Idaho Transportation Department (ITD) regarding the Level 2 Alternatives for the Rathdrum Prairie Planning and Environmental Linkages (PEL) Study. The letter details procedural and analytical failures, non-compliance with 23 U.S.C. 168 and FHWA guidelines, over-engineered roadway designs, omission of grade separation and multi-modal transit/rail solutions, and calls for four distinct families of alternatives grounded in Performance-Based Practical Design.

    Continue reading: Escalation of Level 2 Alternatives for the Rathdrum Prairie Planning and Environmental Linkages (PEL) Study and Concerns

  2. Communications ·

    Comments on Level 2 Alternatives for the Rathdrum Prairie Planning and Environmental Linkages (PEL) Study

    by

    A letter to Idaho Transportation Department (ITD) regarding the Planning and Environmental Linkages (PEL) Study conducted by HDR Inc. consulting. The study appears to dismiss much of what the people had provided during the input sessions. Further, there is a consistent alignment with local government which have done nothing be present legacy concepts. The process appears to have failed the people of Kootenai County on several fronts.

    Continue reading: Comments on Level 2 Alternatives for the Rathdrum Prairie Planning and Environmental Linkages (PEL) Study